KINETIC APARTMENTS
RESIDENTIAL
LOCATION
Manchester
SECTOR
Residential
CLIENT
ARCHITECT
PROJECT VALUE
£4.5m
CONTRACT
Design & Build
PERIOD
CONTRACT PERIOD
18 Months
THE BRIEF
KEY POINTS
The development was appraised and designed to ensure acoustic levels are to regulation. Internal finishes along with the glazing and ventilation schemes have been designed to ensure environmental levels are achieved.
CHALLENGES
The most challenging element of construction was the design fabrication and erection of the lightweight steel vertical extension. This required significant input from specialist contractors and design team to ensure it co-ordinated with the existing structure and met necessary building standards. Operationally, robust site management was required for deliveries, disposal of waste, noise disturbance and general site cleanliness. The phased build created challenges for subcontractor packages because work flows were disjointed at times. Final stages of the project were completed during the COVID19 pandemic and this was achieved by adopting new safe systems of work.